AI on the construction site

With evidence, not gut feel.

An AI that knows every image of your site, links every delivery to weather data and recognizes every subcontractor. Questions are answered with concrete evidence — not speculation.

4 Live features
Q4 2026 BauForecast goes live
10 Beta slots
BauTV+ AI portal with live data
Three pillars

The AI is not just another tool.It is your memory.

See. Answer. Predict. Trained on 25 years of construction know-how — applicable on every site.

  • See

    Every frame archived

    The AI stores every image, every timestamp, every weather condition. Your site's memory — gapless and searchable.

  • Answer

    With evidence, not gut feel

    Questions are answered with concrete images, data and timestamps. No assumptions. No new claims.

  • Predict

    Risks before standstill

    Storm warning 48 hours before crane work. Frost night before pouring. The AI reports what threatens your plan — before it's too late.

Eight functions

What the AI does today— and in 12 months.

Four features run live. Four come in the next quarters — Beta testers see them first.

  • Live · Today

    Gapless image archive

    A frame every 15 minutes. Searchable by date, time, weather, activity.

  • Live · Today

    Activity detection

    Counts people and vehicles. Detects gate entries, deliveries, subcontractors.

  • Live · Today

    Weather correlation

    DWD and Meteomatics data on every image. Precipitation, temperature, wind — verifiable.

  • Live · Today

    GDPR blurring

    Faces and license plates automatically, dynamically, in real-time. Servers in Germany.

  • Q3 2026

    Push notifications

    The AI reports: storm before crane work, frost before pouring, missing subcontractors.

  • Q3 2026

    Multi-project dashboard

    All sites at a glance. The AI prioritizes what needs attention.

  • Q4 2026

    BauForecast

    Weather × phase × risk. 48-hour warning before standstill.

  • Q1 2027

    Auto site diary

    Daily report ready for signature. Activities, weather, deliveries, defects.

Three real questions

How site managers ask,how the AI answers.

Ask a question, get an answer with image proof, weather data and activity detection. No speculation.

  • SIE

    When did the delivery arrive on Section B on March 14?

    KI

    C25/30 concrete was delivered on 14 March 2026 at 09:37. Cemex mixer, plate MD-CX 410. Unloading until 10:14. Weather: 9 °C, rain since 09:22.

    Delivery 14.03. · 09:37
    Unloading 10:14
    Weather 9 °C · Rain

    Belegt durch

    • Image 09:37 (Camera 1 · Overview)
    • Weather DWD 09:22 – 11:47
    • Activity detection · Mixer entry 09:35

    KI · 14.03.2026 · 10:21

  • SIE

    Was it raining when reinforcement was placed in floor 1?

    KI

    Yes. Reinforcement work on floor 1 ran on 11 March from 07:30 to 15:20. Precipitation from 13:05 to 14:48 (1.2 mm). Work was not interrupted, reinforcement mats already installed.

    Work 07:30 – 15:20
    Rain 13:05 – 14:48
    Volume 1.2 mm

    Belegt durch

    • Time-lapse 07:30 – 15:20 (Camera 2 · Detail)
    • DWD precipitation 13:05 – 14:48
    • Activity detection · 4 people active throughout
  • SIE

    Who was on site this morning?

    KI

    Between 06:50 and 07:35 this morning, 7 people and 2 vehicles were detected. Electrical subcontractor (logo recognition) arrived 07:18, 4 people. Safety distances maintained, helmets worn.

    People 7
    Vehicles 2
    Electrical 07:18 · 4 ppl

    Belegt durch

    • Activity detection 06:50 – 07:35
    • Image 07:18 (South entrance)
    • GDPR blurring active
12-month roadmap

Where the AI stands today —and where in 12 months.

Four phases, clear timing. Beta testers see every function first.

  1. Q2 2026 Today · Alpha

    See & Remember

    • Gapless image archive
    • Activity detection
    • Weather correlation
    • Evidence-backed answers
  2. Q3 2026 Beta

    Understand & Notify

    • Trade identification (logo/clothing)
    • Push notifications
    • Multi-project overview
    • Handover prep
  3. Q4 2026 Live

    Predict & Warn

    • BauForecast weather × phase × risk
    • Storm / frost / heat warnings
    • Delivery ETA from logistics
    • Real-time defect detection
  4. Q1 2027 Scale

    Plan & Control

    • Auto site diary for signature
    • Integrations PlanRadar / Capmo / Aproplan
    • Subcontractor vs. plan
    • Cost deviation detection
Beta programme

10 slots for general contractors

Webinar on 24 June 2026, 11:00 AM. 45-minute demo from the Alpha. Real questions, real answers, real sites. Followed by selection of 10 Beta tester slots.

Made in Germany · DSGVO-konform · 25+ Jahre NetCo · 4 000+ Projekte